Projects

  • Projects
  • Projects
  • Projects
  • Projects

Palm Jebel Ali - Crescent 'A'

Dubai Waterfront - District D

Photo Gallery

Client: Nakheel PJSC

Type of Work:

  • Water Pipeline & Stations
  • Sewage & Drainage
  • Electric Power Lines
  • Electro-Mechanical Equipment
  • Plumbing & Sanitary
  • Roads

Palm Jebel Ali is set to become one of the world's leading tourist destinations. Al Rajhi Construction is executing a contract to perform the Crescent ‘A’ road and infrastructure works and a contract to execute the Fronds Left infrastructure works.

Crescent A road and infrastructure works includes 145,000 m2 of granular sub‐base material, 87,900 m2 of road base material, 165,600 m2 of Asphaltic Concrete surfacing. In addition, a total of 145 km of gas, district cooling, telecommunication, irrigation, sewerage, potable water, fire fighting and storm water networks are being constructed. Also, 93 km of cables are being installed.